Pages

Posts Tagged ‘method statement kerbstone’

Interlocking Paver Block, Chequered Tile & Curb Stone

Thursday, March 18th, 2010

Interlocking Paver Blocks (as per IS 15658:2006)  :

Sizes Colours
60 mm Red,Yellow,Green,Blue,Grey
80 mm Red,Yellow,Green,Blue,Grey
100 mm Red,Yellow,Green,Blue,Grey
150 mm Red,Yellow,Green,Blue,Grey

Designs Available

  • Hexa
  • Plato / Moonstore
  • Falcon
  • Unipaver
  • Trihex
  • Dumble / Fish Shape

Qualities of Interlocking Paver Blocks

  • Water absorption < 6%
  • Abrasion value 1.1 mm
  • Average density > 2000 kg/m³
  • Height of pavers ± 3mm
  • No curing,  no maintenance
  • Excellent aesthetics
  • Heavy load bearing capacity
  • Variety of colors & shapes
  • Highly skid, fire and weather resistant
  • No application of cement mortar for laying
  • Easily, speedily and conveniently installable
  • Incredibly longer life than RCC / PCC flooring
  • Easy to replace / change & immediately usable
  • Blocks and pavers can be made to specifications laid down by clients
  • Compressive strength ranging from 300 kg/cm² to 550 kg/cm² and above

Chequered Tiles:

Sizes Colours
250 x 250 x 22 mm Red,Yellow,Green,Blue,Grey
300 x 300 x 25 mm Red,Yellow,Green,Blue,Grey

Designs Available

  • Small Boxes Shape
  • Lining Shape
  • Moon Shape
  • Cross Lining Shape
  • Plain

Curb Stones:

Curbstones are pre-cast concrete units of different uniform shapes and used for roadside,curb,edge-restraints and similar usages for increasing aesthetic appearance and economical reasons. They are the perfect replacement of old time brick or stone curbing.

Sizes Available

  • 300 x 300 x 100 mm
  • 300 x 300 x 150 mm
  • 450 x 300 x 150 mm

* Curb Stones can be made as per client’s specification also.